14 connected modules ยท built for GCC law firms

Your firm's business development โ€” out of spreadsheets, into one system

Business development is what keeps a law firm growing: the pitches won, the bids submitted, the client relationships turned into repeat instructions. It's too important to run on scattered Excel files, shared inboxes and one person's memory โ€” where deadlines slip, bid bonds expire, and hard-won know-how walks out the door when someone leaves. QuickBD puts the entire function in one comprehensive system: 14 connected modules โ€” pitches, bid bonds and tenders, CVs and experience, events, gifts & compliance, CRM and cross-sell โ€” so every opportunity is tracked, every rule is enforced, and your firm's BD effort compounds year after year instead of starting over.

quickbd ยท 2-min walkthrough
14connected modules โ€” one source of truth
1system replacing a folder of spreadsheets
100%local / offline โ€” nothing leaves the machine
GCCbuilt for Saudi & Gulf law firms
The platform

One place for the entire BD function

From the first RFP on the radar to the signed instruction and the year-end ROI report โ€” every step is tracked, every rule enforced, and knowledge stays with the firm.

Win work

5 modules
๐Ÿ“Š

Proposal pipeline

Every live bid on one timeline

A Gantt view of every pitch and bid โ€” bid โ†’ bond โ†’ submit โ†’ win/lost โ€” with live KPIs across value, win rate and bonds. Click any bar for full detail, the attachment, and a printable briefing.

  • Filter by partner, practice, client and status
  • Date-range window & win/loss KPIs
  • Click-through detail with attachment & view / print
  • Draft bids appear as bars you can reopen
โ— Live
proposal pipeline
Proposal pipeline
๏ผ‹

New-proposal intake

Capture a pitch in five clean sections

Log a bid in minutes: client, opportunity, key dates, bid bond and documents. Pick an existing client or add a new one inline โ€” the client database builds itself as you work.

  • Existing / new client with self-building directory
  • Attach the RFP file, kept with the proposal
  • Save drafts to resume (e.g. once the bond is issued)
  • Values over your thresholds route to Approvals
โ— Live
new-proposal intake
New-proposal intake form
๐Ÿ“

Pitch Builder

A branded proposal in minutes

Assemble a client-ready pitch from your Experience bank matters and partner bios. Toggle the sections you want, add partner headshots, set the fee โ€” then export a formatted PDF or editable Word, or drop it straight into your firm's PDF template.

  • Pulls matters & bios you already captured
  • Partner photos & award badges
  • Export branded PDF or Word
  • Insert into your firm template (template untouched)
โ— Live
pitch builder
Pitch Builder
๐Ÿฆ

Bid-bond tracker

Never let a bond โ€” or the cash โ€” lapse

The full bond lifecycle: issue, expiry, refund and renewal, with week-ahead alerts and a running total of cash tied up. Drafts awaiting completion sit alongside live bonds.

  • Expiry / refund / renewal with dates
  • Week-ahead expiry alerts
  • Cash-tied-up totals at a glance
  • Completion needs Manager sign-off (configurable)
โ— Live
bid-bond tracker
Bid-bond tracker
๐Ÿ›ฐ

Tender / RFP radar

Add every RFP to the radar โ€” move it to a proposal once you win

Keep every RFP the firm is chasing on one radar. Add opportunities as they come in, score them by fit and flag local-content, then promote one into a live proposal in a single click โ€” and follow it all the way through to won.

  • Add all RFPs you're tracking to one radar
  • Score by fit & flag local-content and bid-bond
  • Promote to a live proposal in one click
  • Move it through bid โ†’ submit โ†’ won
โ— Live
tender / rfp radar
Tender / RFP radar

Prove expertise

3 modules
๐Ÿ‘ค

CV / credentials generator

One profile โ†’ the right CV for any pitch

Store each lawyer's experience once. Pick a partner and a specialisation and QuickBD assembles a tailored, branded CV โ€” surfacing the relevant matters, hiding the rest. Add a headshot, choose one-page or detailed, export to PDF, or build a multi-CV pack into your firm template.

  • Tailored per specialisation from one profile
  • Headshot photos & hand-picked matters
  • One-page or detailed, branded PDF
  • Insert a CV pack into your firm's PDF template
โ— Live
cv generator
CV generator
๐Ÿ—‚

Experience bank

Every matter, deal & win โ€” searchable

One clean record of what the firm has done: searchable client, sector, practice and deal value. It feeds CVs, pitches and directory submissions โ€” so hard-won credentials never get lost or re-typed.

  • Search by client, practice, value, year
  • Hand-pick matters for a partner's CV
  • Feeds Pitch Builder & Directories
  • Bulk import from a spreadsheet
โ— Live
experience bank
Experience bank
๐Ÿ†

Directory & awards

Chambers & Legal 500, under control

Manage every directory submission โ€” practice, deadline, progress and current band โ€” with full referee management: who's agreed, pending or declined, drawn from your best client relationships.

  • Submission tracker with deadlines & progress
  • Current band / tier per practice
  • Referee management with statuses
  • Referees suggested from client feedback
โ— Live
directory & awards
Directory & awards

Activities, spend & compliance

3 modules
๐Ÿ“…

Events, gifts & hospitality

Seminars, sponsorships & client events

Plan every BD event on a shared calendar โ€” who's attending, when, where and what it costs โ€” with a per-event expense breakdown and local-content checks. Export to .ics so it drops into everyone's Outlook / Google Calendar.

  • Calendar with cost & attendee breakdown
  • Occasion types incl. National / Founding Day, Ramadan
  • .ics import & export
  • Local-content flags for gifts & performers
โ— Live
events calendar
Events calendar
add event / activity
Add event form
๐Ÿ’ฐ

BD spend & ROI

What you spend vs the work you win

The one report a managing partner actually asks for: total BD cost, cost-per-acquisition, spend-vs-work-won and local-content %, with channel-by-channel performance so you know which BD activity actually pays.

  • Total cost, CAC & spend-vs-won
  • Where the money went, by category
  • Channel performance & ROI ranking
  • Local-content share of BD spend
โ— Live
bd spend & roi
BD spend & ROI
๐Ÿ›ก

Gifts & hospitality register

Anti-bribery compliance, audit-ready

A defensible, audit-ready log of every gift and hospitality item given or received โ€” with automatic policy-limit checks and a mandatory flag for government officials. Built for firms doing government-facing work.

  • Given / received log with values
  • Automatic policy & gov-limit checks
  • Approval trail for each entry
  • Export & audit for government clients
โ— Live
gifts register
Gifts & hospitality register

Relationships & growth

3 modules
๐Ÿ”—

Relationship CRM

Who knows whom โ€” from your own inboxes

A push-button local scan reads partner and BD inboxes, parses signatures into clean contacts with designations, de-duplicates them, scores relationship strength and builds a who-knows-whom map โ€” all on the machine, nothing sent anywhere.

  • Local mailbox scan โ†’ structured contacts
  • Relationship-strength scoring
  • Who-knows-whom map
  • Import an existing contact list
โ— Live
relationship crm
Relationship CRM after scan
๐ŸŽฏ

Cross-sell / whitespace

Which practices each client isn't using yet

A matrix of every client against every practice โ€” instantly showing the whitespace where you already have the relationship but not the work. Each opportunity comes with the warm internal introduction to make.

  • Client ร— practice whitespace matrix
  • Top opportunities ranked by value
  • Warm-intro owner for each gap
  • Feeds directly off your client list
โ— Live
whitespace map
Cross-sell / whitespace
๐Ÿ’ฌ

Client feedback / listening

Turn debriefs into referees & retention

Capture matter debriefs and NPS after each engagement. Promoters become directory referees and testimonial candidates; detractors trigger a partner-led service-recovery follow-up before they churn.

  • Matter debriefs & NPS scoring
  • Promoters โ†’ referees / testimonials
  • Detractors โ†’ service-recovery flags
  • Feeds the Directory referee list
โ— Live
client feedback & listening
Client feedback & listening dashboard

And it all rolls up

dashboard
๐Ÿ“ˆ

Reports & command dashboard

The whole function on one screen

Everything above rolls up into one command dashboard โ€” pipeline, spend & ROI, bonds, NPS and whitespace โ€” with date-range reports you can generate and export for partner meetings.

  • Every module summarised in one place
  • Date-range reports you can export
  • Manager-level view for partner meetings
โ— Live
๐Ÿ“ˆ
Command dashboard
Pipeline ยท spend ยท bonds ยท NPS ยท whitespace, rolled up.
Screenshot on request
Recently added

What's new

The latest capabilities across the platform.

๐Ÿ“ท

Headshot photos

Add a lawyer's photo once โ€” it appears on their CV and across every pitch, PDF and Word export.

๐Ÿงฉ

Insert into your firm template

Drop generated CVs or a whole proposal into your firm's existing PDF at a chosen page โ€” the template itself is never altered.

๐Ÿ‘

View proposals

Browse proposals by date range, preview the attachment inline, download it, and print a clean briefing for a meeting.

โฌ‡

One-click import

Bring existing matters, contacts, bids, bonds, tenders, events and spend in from a spreadsheet โ€” a tab for every one of the 14 modules.

๐Ÿ”’

Role-based access

Manager vs BD Assistant roles, approval thresholds, and configurable access โ€” e.g. keep data import Manager-only.

Microsoft SSO

Sign in with your existing Microsoft 365 account โ€” no new passwords. IT controls access centrally via Entra ID, and leavers lose access automatically.

๐Ÿ–ฅ

Local & offline

Everything runs on the machine. No cloud, no data leaving the firm โ€” important for confidential, government-facing work.

For IT / systems admin

Set up in 10 minutes

QuickBD runs on your own machines / on-prem โ€” no new servers, nothing in the cloud. Two one-time tasks and the BD team is live: activate the firm licence, connect Microsoft (or Google) single sign-on, then the BD Manager assigns roles in-app.

1~3 min

Activate the licence

Enter the firm's org-wide key (QBD-XXXX-XXXX-XXXX) once โ€” not per user. Plan, seat count & expiry then show in Settings and every account menu.

2~5 min

Connect SSO

Register QuickBD in Microsoft Entra ID (or Google Workspace) โ€” OIDC, redirect URI โ€ฆ/login.html, emit the verified email claim, and restrict to your firm's tenant. SAML 2.0 also supported.

3~2 min

Grant roles

The BD Manager opens Users and adds each colleague by work email as Assistant or Manager. Anyone not on the list is denied at login โ€” that's what keeps QuickBD BD-only.

Go-live checklist
  • Licence activated โ€” version & expiry visible in Settings
  • QuickBD registered in Entra ID / Google with the redirect URI
  • App restricted to the firm tenant / domain
  • BD Manager confirmed; team added under Users
  • Test sign-in with one Assistant + one Manager
๐Ÿ” SSO proves who you are (verified email); QuickBD's own Users list decides the role. Enterprise option: drive roles from Entra groups via a roles claim. A full step-by-step guide is provided at onboarding.

๐Ÿ“– Further reading: Business Development for Law Firms โ€” A Practical Playbook for the GCC โ†’

The whole BD function, in one system

Fourteen connected modules covering pitches and bid bonds, tenders, CVs and experience, events, gifts and compliance, CRM, cross-sell and feedback โ€” built for GCC law firms.

QuickBD
Business development for GCC law firms ยท demo preview.